VAMC Parking Structure – Long Beach

LONG BEACH, CA. – April 26, 2024 – Klorman Construction has been selected as the general contractor by the US Army Corps of Engineers for the development of a parking structure in the Los Angeles District.

Located at the Veterans Administration Medical Center in Long Beach, the three story – 165,676 square foot – parking garage provides 491 parking spaces which will support operations at the medical center.

The three-level concrete parking structure features a steel structure at the top level of the garage and will support a photovoltaic system with over 1,200 modules. The exterior of the garage is designed with architectural screens, a panelized exterior insulation finish system at the roof exterior, a blade wall with fiber cement panels, and US Space Force, Coast Guard, Navy, Air Force, Army, and Marine Corps flags and medallions. The project also features a surface parking lot with 54 spaces and EV Charging Stations.

Klorman Construction will not only act as the General Contractor but will also self-perform the structural concrete frame through our Concrete & Formwork Division. The project is slated for an immediate start.

Pepperdine University Parking Structure – Malibu

Klorman Construction is selected by Clark Construction to perform the Structural Concrete portion of the “Mountain” project parking structure located at Pepperdine University.

The new complex will include a three-story indoor sports arena along with another three-story building featuring a student fitness center that will replace the Rho parking lot.

The project also includes a multi-level parking garage that will hold up to 831 vehicles, replacing the parking spaces lost by constructing two buildings and various outdoor areas on top of the Rho parking lot. Klorman Construction is proud to be selected by Clark Construction to construct this parking structure.

710 Broadway – Santa Monica

Located in the quintessential southern California beach city of Santa Monica, 710 Broadway will bring the values of the community to fruition by embodying timeless urban design, an expanded grocery store, neighborhood-serving retail, market-rate and affordable housing, efficient transit and sustainable systems and operations.

710 Broadway will deliver 280 residential units, of which 30% will be reserved for low-income and middle-income households, a 53,500 square foot grocery store, and approximately 34,000 square feet of neighborhood-serving retail to Santa Monica. The new grocery store will be prominently located at the corner of Lincoln and Broadway and will continue to be operated by the Albertsons Companies. The additional community-serving retail will activate the corner of 7th and Broadway. 710 Broadway will be designed and built to a high level of sustainability and will be pedestrian friendly and transit oriented.

710 Broadway consists of market rate and affordable housing above the ground floor grocery store, plus additional local serving retail/restaurant/fitness uses located on both the ground floor and below-grade, and subterranean parking.

The grocery store is approximately 53,500 square feet on the ground floor, with 1,500 square feet of outdoor dining space and additional below-grade storage. 710 Broadway also offers approximately 34,000 square feet of additional local serving retail/ restaurant/fitness uses with approximately 523 bicycle spaces and 354 vehicle parking spaces. Sustainable landscaping and open spaces will be located along Lincoln Boulevard and Broadway.

Wilshire Curson Apartment Tower

Project Name: Wilshire Curson Apartment Tower

Klorman Construction has been selected as the structural concrete subcontractor for J. H. Snyder Company’s Wilshire Curson apartment tower development named for the nearby intersection of Wilshire Boulevard and Curson Avenue across from the La Brea Tar Pits.

Architect or Engineer:

The architecture firm of MVE+Partners provided design services, while J. H. Snyder is serving as their own general contractor.

Description of Project:

The 263.92? tall 26-story concrete framed building consists of 24 stories above grade featuring 285 residential units and a two-level, 410 car basement parking garage, as well as a rooftop pool deck.

This is another example of our growing reputation and expanded roles on various mixed-use properties, a testament to the hard work and dedication our talented team has developed over the years said Bill Klorman, president of Klorman Construction.

Main Street Apartments

Main Street Apartments

Project Name:
Main Street Apartments

Location:
Irvine, CA

Owner:
Met Life Real Estate Investment

Architects:
Architects Orange and Parkitects

Description of Project:
Klorman Construction provided the design/build construction services for the 6-level, 1,020-stall parking structure wrap for the 481-unit Main Street Village apartment complex. A mat slab foundation below the subterranean level was required due to the high ground water table in that area of Irvine.

Savy Ranch Auto Mall

Savy Ranch Auto Mall

Project Name:
Savy Ranch Auto Mall

Location:
Weir Canyon, Anaheim, CA

Owner:
General Motors World Wide Facilities Group

Architect or Engineer:
Whitfield & Associates

Description of Project:
Design/Build Post-Tensioned Auto Dealership.

The Source

The Source

Project Name:
The Source

Location:
Buena Park, CA
Owner:
M&D Properties for The Source at Beach LLC

Description of Project:
Klorman Construction was the design/build general contractor for this six level, 1,710-stall parking structure for The Source a 500,000-square-foot major mixed use retail center, office, and hotel complex in Buena Park, CA. The project is a landmark development for the city and is a premier destination, featuring a wide array of shopping, dining, and entertainment.

The multi-story development features unique and energetic contemporary design with state-of the art electronic imagery. The parking structure, was built using the Geopier system, a unique site improvement method and technology that is designed to strengthen soft soil locations. Additionally, the parking structure features double-sided door elevators and varying parking level heights to accommodate the varying retail building floor heights.

Azusa Intermodal Parking Structure

Azusa Intermodal Parking Structure

Project Name:
Azusa Intermodal Parking Structure

Location:
801 N. Alameda Ave., Azusa, CA

Owner:
Foothill Transit

Description of Project:

Extension Azusa-Alameda Station. The design reflected the traditional architecture of the surrounding community. Portions of the project required extensive demo and relocation of existing utilities and includes the expansion of an adjacent street lane to accommodate four bus bays for loading and unloading of passengers.

555 Newport Center Parking Structure

555 Newport Center Parking Structure

555 Newport Center Parking Structure

Project Name:
555 Newport Center Parking Structure

Location:
Newport Beach, CA

Owner:
Irvine Company

Architect or Engineer:
Choate Parking Consultants, Irvine, CA

General Contractor:
Klorman Construction

Description:
Klorman Construction was the post-tensioned structural concrete frame contractor for this 696-stall, four-level parking structure. This is Klorman’s second parking structure located in the Class A Newport Center office complex that provides on-site parking for the Irvine Co.’s 300,000-square-foot 19-story office building.

545 Newport Center Parking Structure

545 Newport Center Parking Structure

Project Name:
545 Newport Center Parking Structure

Location:
Newport Beach, CA

Owner:
Irvine Company

Architect or Engineer:
Choate Parking Consultants, Irvine, CA

General Contractor:
Klorman Construction

Description:
Klorman Construction was the post-tensioned structural concrete frame structure contractor for this 1,100-stall, five-level parking structure serviced by two decorative elevator towers is located in the Class A Newport Center office complex. The parking structure provides on-site parking for the Irvine Co.’s 300,000-square-foot 19-story office building.