City of Hope MOB

Project Name:
City of Hope MOB

Location:
City of Hope

Description of Project:
Klorman Construction was the structural concrete sub-contractor of the City of Hope Medical Office Building.

City of Long Beach Civic Center Parking Structure

Project Name:
City of Long Beach Civic Center Parking Structure

Location:
400 W Broadway, Long Beach, CA 90802

Description of Project:
Klorman Construction was the general contractor of the City of Long Beach Civic Center parking structure that provides parking for law enforcement and city employees.

This is a 5-level, 334-car parking structure.

Cerise Amazon Ring Parking Structure

Project Name:
Cerise Amazon Ring Parking Structure

Location:
12515 Cerise Ave, Hawthorne, CA 90250

Description of Project:
Klorman Construction was the general contractor of the Cerise Amazon Ring parking structure that provides parking for Amazon employees.

This is a 7-level, 686-car parking structure.

Covina Transit Park and Ride Facility Parking Structure

Project Name:
Covina Transit Park and Ride Facility Parking Structure

Location:
1126 N Citrus Ave, Covina, CA 91722

Description of Project:
Klorman Construction was the general contractor of the Covina Transit Park and Ride Facility parking structure that provides parking for local residents who choose public transportation for their commutes into downtown Los Angeles.

This 3-level, 140,000-sq ft, 372-car parking structure. The parking structure and landscaping features a public plaza located between a retail building, the parking structure and the transit plaza with bus bays are designed to ease concerns, regarding privacy and traffic noise in consideration of the surrounding neighborhood. The plazas are designed to be used by current and future residents of the development to the north as they access Foothill Transit’s retail building and transit center.

The Covina Transit Center and Park & Ride is part of a public-private partnership effort, called the Covina Forward. It features a transit plaza with bus bays, retail, parking, a public plaza, and connective pathways.

VAMC Parking Structure – Long Beach

LONG BEACH, CA. – April 26, 2024 – Klorman Construction has been selected as the general contractor by the US Army Corps of Engineers for the development of a parking structure in the Los Angeles District.

Located at the Veterans Administration Medical Center in Long Beach, the three story – 165,676 square foot – parking garage provides 491 parking spaces which will support operations at the medical center.

The three-level concrete parking structure features a steel structure at the top level of the garage and will support a photovoltaic system with over 1,200 modules. The exterior of the garage is designed with architectural screens, a panelized exterior insulation finish system at the roof exterior, a blade wall with fiber cement panels, and US Space Force, Coast Guard, Navy, Air Force, Army, and Marine Corps flags and medallions. The project also features a surface parking lot with 54 spaces and EV Charging Stations.

Klorman Construction will not only act as the General Contractor but will also self-perform the structural concrete frame through our Concrete & Formwork Division. The project is slated for an immediate start.

Pepperdine University Parking Structure – Malibu

Klorman Construction is selected by Clark Construction to perform the Structural Concrete portion of the “Mountain” project parking structure located at Pepperdine University.

The new complex will include a three-story indoor sports arena along with another three-story building featuring a student fitness center that will replace the Rho parking lot.

The project also includes a multi-level parking garage that will hold up to 831 vehicles, replacing the parking spaces lost by constructing two buildings and various outdoor areas on top of the Rho parking lot. Klorman Construction is proud to be selected by Clark Construction to construct this parking structure.

710 Broadway – Santa Monica

Located in the quintessential southern California beach city of Santa Monica, 710 Broadway will bring the values of the community to fruition by embodying timeless urban design, an expanded grocery store, neighborhood-serving retail, market-rate and affordable housing, efficient transit and sustainable systems and operations.

710 Broadway will deliver 280 residential units, of which 30% will be reserved for low-income and middle-income households, a 53,500 square foot grocery store, and approximately 34,000 square feet of neighborhood-serving retail to Santa Monica. The new grocery store will be prominently located at the corner of Lincoln and Broadway and will continue to be operated by the Albertsons Companies. The additional community-serving retail will activate the corner of 7th and Broadway. 710 Broadway will be designed and built to a high level of sustainability and will be pedestrian friendly and transit oriented.

710 Broadway consists of market rate and affordable housing above the ground floor grocery store, plus additional local serving retail/restaurant/fitness uses located on both the ground floor and below-grade, and subterranean parking.

The grocery store is approximately 53,500 square feet on the ground floor, with 1,500 square feet of outdoor dining space and additional below-grade storage. 710 Broadway also offers approximately 34,000 square feet of additional local serving retail/ restaurant/fitness uses with approximately 523 bicycle spaces and 354 vehicle parking spaces. Sustainable landscaping and open spaces will be located along Lincoln Boulevard and Broadway.

Wilshire Curson Apartment Tower

Project Name: Wilshire Curson Apartment Tower

Klorman Construction has been selected as the structural concrete subcontractor for J. H. Snyder Company’s Wilshire Curson apartment tower development named for the nearby intersection of Wilshire Boulevard and Curson Avenue across from the La Brea Tar Pits.

Architect or Engineer:

The architecture firm of MVE+Partners provided design services, while J. H. Snyder is serving as their own general contractor.

Description of Project:

The 263.92? tall 26-story concrete framed building consists of 24 stories above grade featuring 285 residential units and a two-level, 410 car basement parking garage, as well as a rooftop pool deck.

This is another example of our growing reputation and expanded roles on various mixed-use properties, a testament to the hard work and dedication our talented team has developed over the years said Bill Klorman, president of Klorman Construction.